Hauling Concrete

So, this isn’t the most glamorous or interesting post but I thought I’d throw it on the blog because hauling 5-6 truck loads of concrete is A LOT of work. With the work my brother and I have done it’s easily 40 hours of heavy manual work.

Of course, with the right equipment that time could be cut in half (we only had a 60 pound jack hammer).

After jack hammering continously for about 11 hours my brother and I removed theĀ  walkway on the side of the house, a random pad of concrete (12 feet x 12 feet x 8-10 inches) and a deck (about 15 feet by 8 feet).

Anyway, here’s the pile after the demo:

 

And here’s what the truck looked like (load 3 of 6):